September 2011
Just happened by in time to watch the Sky Trak operator load in another batch of blocks, transferring them from the parking lot to the work site.
Holes must be drilled to receive and seat the vertical rods which are slowly becoming a "forest". There are no sounds of diesel engines or "back-up" beepers, but the work proceeds intensely as the blocks are sorted out and carried to their assigned location.
From the northeast corner to the southwest entrance to the site, walk along with us as we tour the progress being made in September.